Main menu
Home
About-us
How we build
Developments
Sales
Furniture
Viewing Trip
Other links
Bulgaria
Bansko
Sunny Beach
How We Build
DESCRIPTION OF ARCHITECTURAL AND CONSTRUCTION WORKS,
STAGE OF COMPLETION AND MATERIALS USED
Reinforced concrete skeleton construction: reinforced concrete frame according to project; outside walls - 25cm thick - brick or gas concrete; inside walls - 12cm. - gas concrete or brick; floor height - 260cm;
Garden layout: hedgerow, landscape architecture and alleys according to architectural plan;
Outside facade: woodwork, PVC with glass packet, plinth facing, insulation of min. 50mm adhesive fixed to the facade, anchored wire-net, ground coating, stone adhesive fixed or stone masonry; facade facing: insulation of min. 50mm adhesive fixed to the facade, anchored wire-net, ground coat and mineral or silicate stucco;
Roof: reinforced concrete skeleton construction, vapour barrier, thermo insulation, stone wool or EPS insulation, board lining, bituminous insulation, eaves and dormer windows with board lining, chimney caps, seamless gutters with powder painted finish and PVC cover, drain pipes;
Finishing works on the interior
Bedrooms: ceiling - plaster coat, white latex finish - 2 layers; walls - plaster coat or plaster board, white latex finish - 2 layers; floor - laminated parquet or ceramic tiles;
Bathroom and WC: ceiling - sprayed or silicate stucco; walls and floor - ceramic tiles;
Living room and kitchen: ceiling - plaster coat, white latex finish - 2 layers; walls - plaster coat, white latex finish - 2 layers; floor - laminated parquet or ceramic tiles;
Common parts: ceiling - plaster coat, white latex finish - 2 layers; walls - plaster coat, white latex finish - 2 layers; floor - ceramic tiles; reinforced entrance door for exterior installation;
Plumbing: PVC brackets and pipes; kitchen - capped pipes; water supply system according to project; sewer system according to project connected to public sewer system;
Electric wiring: common parts - lighting, electricity meter and automatic circuit breaker for the staircase; apartments - monophase electricity meter, miniature circuit breaker consumer unit and wiring according to project, door bell, intercom; sockets and switches fixed in compliance with project, lighting - up to lamp holder, electric water heater switch;
Heating: separate electric wiring for heating installed on each of the premises, electric convectors or air-conditioners;
Thermotechnics: outside walls - brick or gas concrete, EPS insulation - min. 50mm, mineral stucco with board lining, partial stone facing of the facade.
 

  Copyright © 2006   STC BUILDING GROUP Ltd.
Powered by: CSD Ltd.